Chat
Solar Panel Installation
Get 60% To 90% Meralco Bill Reduction

Stop Paying Too Much for Electricity

Join thousands of Filipino homeowners saving ₱50,000+ yearly. Get reliable power that pays for itself.

System Types

Understanding the difference between Grid-Tie and Hybrid systems.

Grid-Tie System

  • Connected to Meralco grid - works when grid is active
  • No battery backup - no protection during outages
  • Saves on electricity by offsetting daytime usage
  • Lower upfront cost
Recommended

Hybrid System

  • Includes battery storage for backup power
  • Works during brownouts and outages
  • Stores excess solar for nighttime use
  • 24/7 energy security - maximize savings

Choose Your Package

Initial price estimates. Subject to site survey. Prices may change due to stock availability.

Package 1

3kW Inverter
5 Solar Panels
STARTS AT
₱125,000
(Grid-Tie)
or
₱225,000
(Hybrid)
w/ 1 100AH Battery

Package 2

6kW Inverter
9 Solar Panels
STARTS AT
₱205,000
(Grid-Tie)
or
₱325,000
(Hybrid)
w/ 2 100AH Batteries

Package 3

10kW Inverter
16 Solar Panels
STARTS AT
₱325,000
(Grid-Tie)
or
₱525,000
(Hybrid)
w/ 3 100AH Batteries

+₱40,000 per additional 100Ah battery

Hybrid systems store solar energy for nighttime use - maximize savings 24/7, plus brownout protection

Very Low To Near-ZERO Meralco Bill

Our Installations

Proudly serving homeowners across Metro Manila and Bulacan.

DUNYS Solar installation in Caloocan
Caloocan, Metro Manila

6kW Hybrid Installation

Residential rooftop with backup battery setup, slashing Meralco bill by 75%.

DUNYS Solar installation in Bulacan
San Jose del Monte, Bulacan

3kW Hybrid Installation

Clean solar panels on metal sheet roof providing brownout protection.

Monocrystalline solar panels close-up
Quality Assurance

Premium 500W Panels

Close-up of clean, high-performance monocrystalline panels and mounting rails.

Savings Calculator

See your estimated savings instantly. Pick a package, then get your personalized quote.

Solar Installation Areas

We install residential grid-tie and hybrid solar systems across Caloocan, Metro Manila, NCR, and Bulacan.

Caloocan Solar Installation

On-site assessment, clean roof layout, and package sizing based on your household Meralco usage.

Metro Manila / NCR Solar

Fast support for homes in NCR with options for both daytime bill reduction and backup-ready hybrid setups.

Bulacan Solar Installation

Professionally installed 500W panel systems with right-sized battery options for long-term savings.

Solar FAQ

Quick answers about savings, payback, backup power, and battery lifespan.

How much can I save on my Meralco bill with solar?

Many homes can reduce bills by around 75% to near 100% when the package size matches actual monthly usage.

What is the typical payback period?

For many households in Metro Manila and Bulacan, payback is commonly around 3 to 6 years depending on usage and package size.

Will I have power during a brownout?

Grid-tie systems typically shut down during outages, while hybrid systems with batteries can power essential appliances.

How long do 100Ah batteries last?

Battery life depends on depth of discharge, temperature, and charge settings, but well-maintained systems usually provide several years of service.

Get In Touch

Want a more specialized quote? Schedule a site survey (₱1,000 fee credited toward your package). We'd love to hear from you!

DUNYS Solar

Contact Information

Website

dunyssolar.com

Address

UNIT 6, B22 L5 GRACEVILLE 1, MUZON, SJDM, Bulacan

Call Messenger Quote